Interior Design Bathroom, Japanese Interior Design, Black Modern Interior Design Staircase Interior Design Staircase, Modern Double Wide, Modern Interior Design, Traditional Interior Design Living Room From Japan Interior Design Living Room

Many Building Progress: 9 weeks to go!

Many Building Progress: 9 weeks to go! - hello friend, welcome to our blog Modern Double Wide this time we will discuss what you are looking for information that is on Many Building Progress: 9 weeks to go! We've collected a lot of data to make this article so that what we show complete enough for you, ranging from information design house that long until the latest, well please continue reading:

You can also see our article on:


Many Building Progress: 9 weeks to go!

With only two months to go (yes, that's right, we have to move out of our rental on September 10th!), things are moving full steam ahead. It will be tight but I'm positive we'll do it!

The outdoor sandstone wall by the pool is being built ...




And the internal sandstone wall that spans the entry down to the level below is underway.


The 'floating' stairs leading from the entry up to the living have been erected.
 


The timber floors are going down (pictures to come), the gyprocking is nearly completed, the joiner has begun making his 'bits', we have finalised the curtains and blinds and now, we have to decide on paint colours and pool tiles. Bring on those test pots!


finished already articles that discuss Many Building Progress: 9 weeks to go! there can bookmark or share clicking the link https://kjnjnnn.blogspot.com/2011/07/many-building-progress-9-weeks-to-go.html if it was helpful for you, hopefully in the article gives a broad insight about the design of the house.

Share on Facebook
Share on Twitter
Share on Google+
Tags :

Related : Many Building Progress: 9 weeks to go!

0 komentar:

Post a Comment